Rennes City and Metropolitan Area

2025 – 2026

Rennes, FRANCE


At the heart of a territory engaged in the energy transition, Rennes City and Metropolitan Area They benefit from a very extensive heritage of parking lots. The Law on Accelerating the Production of Renewable Energies (APER) now requires the installation of photovoltaic shelters on parking lots larger than 1,500 m². In this context, 346 parking lots have been identified as having photovoltaic potential, of which 123 are subject to compliance obligations. The project is part of a collective self-consumption initiative aimed at optimizing the energy consumption of the city’s heritage assets on a metropolitan scale.
Rennes Ville et Métropole has commissioned setec énergie environnement to define the solarization strategy for their parking lots, thus enabling the territory to accelerate its ecological transition.

At the heart of a territory engaged in the energy transition, Rennes City and Metropolitan Area They benefit from a very extensive heritage of parking lots. The Law on Accelerating the Production of Renewable Energies (APER) now requires the installation of photovoltaic shelters on parking lots larger than 1,500 m². In this context, 346 parking lots have been identified as having photovoltaic potential, of which 123 are subject to compliance obligations. The project is part of a collective self-consumption initiative aimed at optimizing the energy consumption of the city’s heritage assets on a metropolitan scale.
Rennes Ville et Métropole has commissioned setec énergie environnement to define the solarization strategy for their parking lots, thus enabling the territory to accelerate its ecological transition.

As a Technical Master of Works (AMO) Assistant, we intervene on the following tasks: Setec organization :

  • State of the art technological solutions for photovoltaic shading to solidify the framework on which the studies are based;
  • Technical, economic and financial feasibility studies for the canopies;
  • Regulatory analysis applied to selected parking lots and identification of cases of exemption under the APER law;
  • Evaluation of the interest of patrimonial self-consumption loops;
  • 3D simulations of installations.
Challenge

Balancing the latest regulatory requirements, the technical constraints specific to each parking space, and energy optimization through self-consumption loops.

Key figure
  1. 170 studies to be carried out for the mission
Expertise
  1. Photovoltaic
  2. 3D modelling