Client
NEXANS NORWAY AS
CALENDAR
2024-2025
LOCALISATION
Dieppe – Le Tréport, FRANCE
Context
As part of the electrical connection of the Dieppe – Le Tréport wind farm RTE, work to create excitement was carried out by the company NEXANS.
Setec énergie environnement was asked to monitor the turbidity of the works throughout the entire construction phase, over a period of 16 months.
DETAILED MISSIONS
setec énergie environnement designed and deployed a real-time turbidity monitoring system to track the effects of dredging operations on the marine environment throughout the duration of the project.
The services provided include:
- The design and deployment of a network of 5 connected buoys equipped with turbidity measurement probes and automatic cleaning systems for the sensors;
- The acquisition, transmission and real-time visualization of environmental data;
- The definition and implementation of a specific NTU/MES calibration protocol ensuring the reliability and accuracy of measurements;
- The hosting and the provision of the data on the Proxymae web platform;
- The implementation of an automated system for alerts in the event of exceeding turbidity thresholds, equipment fouling, or transmission interruption;
- The analysis and interpretation of the data obtained during the work;
- The production of weekly reports intended for the project teams;
- The intervention complies with the HSSE requirements applicable to offshore operations.
Thanks to this customized solution, Nexans has benefited from continuous access to environmental data and decision-support tools that enable the reactive monitoring of operations at sea.